On May 15, 2023, we started the geotechnical drilling for section 2 of the M5 metro line, an essential project for the development of Bucharest's transport infrastructure. This new phase marks an important step in the realization of a vital connection between the Pantelimon district and the Eroilor area, which will improve urban mobility in the capital
Section 2 of the M5 Magistrale, which will link Eroilor to Iancului Square, stretches 5.4 kilometers of double track and will include six strategic stations:
- Hașdeu
- Cișmigiu
- University
- Calea Moșilor
- Traian
- Iancului Square

This route has been designed to serve key areas of the city, giving Bucharest's residents quick and efficient access to important points of interest. Once completed, the new busway will make a significant contribution to decongesting surface traffic and provide a modern and efficient public transport alternative.
The Geostud team, made up of experts with extensive experience in the field, will ensure that the geotechnical borings are carried out to the highest quality standards. The data and technical information obtained from these boreholes will form the basis for the detailed design of this section of the Bucharest metro network.
We have taken the responsibility to complete this phase of the project in an efficient and professional manner, meeting all quality and safety standards. Dedicated to ensuring quality and excellence at every stage of the project, our team of experts will carefully supervise the geotechnical borings and provide accurate and detailed information required to prepare the design for Section 2 of the M5 metro line.
